PHASE 1: STAGE RENOVATION (Part 2)
Page 1 of 1
PHASE 1: STAGE RENOVATION (Part 2)
The Convery Hall's stage will be relocated at the former location of the main door. The classroom beside it will be used as dressing room and the former office of Mr. Segundo Redondo will be demolished and will be used as hallway beside the stage. Revisions has been made prior to the request of the Columban College officials.
The stage has been removed from its former location and is now being assembled to its new place.
The proposed design of the new stage will be the same based on the stage design submitted to Ma'am Cecile and Msgr. Crisostomo Cacho.
The stage has been removed from its former location and is now being assembled to its new place.
The proposed design of the new stage will be the same based on the stage design submitted to Ma'am Cecile and Msgr. Crisostomo Cacho.
Similar topics
» PHASE 1: STAGE RENOVATION
» PHASE 1: STAGE RENOVATION (as of February 7, 2011)
» Renovation of President's Office
» Renovation of Lindayag Gate
» PHASE 1: STAGE RENOVATION (as of February 7, 2011)
» Renovation of President's Office
» Renovation of Lindayag Gate
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|